Completed Event: Football versus #12 BYU on November 21, 2026 , Loss , 29, to, 31 , (3OT)
Football
29
vs #12 BYU
(3OT)
31

| Opened | February 2019 |
| Architect | HNTB |
| Cost | $26 million |
| Overall Size | 90,000 sq. ft. |
| Practice Space | 120-yard field, including end zones |
| Surface | FieldTurf 360 monofilament turf with 9.2lbs of infill per sq. ft. |
| Temperature Controlled | Fully functional heating and air conditioning systems |
| Lighting | Natural filtered light along all facades to recreate game day experience |
| Technology | State of the art practice video system and audio controls |